Noori, S., Ghannadpour, S.F., Integrated scheduling of suppliers and multi-project activities for green construction supply chains under uncertainty,Automation in Construction, 2021, 122, 103485.
Noori, S., Noorossana, R., Bagherpour, M.,An ex ante control chart for project monitoring using earned duration management observations, Journal of Industrial Engineering International, 2018, 14(4), pp. 793–806.
Haeri, A., Noori, S,Automotive vendor's performance evaluation and improvement plan presentation by using a data envelopment analysis, International Journal of Engineering, Transactions B: Applications, 2018, 31(2), pp. 374–381.
Haeri, A., Noori, S., Using data envelopment analysis to evaluate the performances of food production companies based on EFQM’s criteria and to present an improvement plan,International Journal of Business Excellence, 2018, 14(2), pp. 256–274.
11-Resource allocation in multi-class dynamic PERT networks with finite capacity, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH,SaeedYaghoubi, SiamakNoori, AmirAzaron, BrianFynes, ISI, (2015), pp 879–894.
12- Knowledge network creation methodology selection in project- based orgznizattions an empirical frame work, Aslib Journal of informantion management, Bourouni, Simak noori, Mostafa jafari, ISI, 2014, PP 74-93
13-A note on article ‘‘Farm management optimization using chance constrained programming method’’, Computers and Electronics in Agriculture, Behnam Beheshtipour , Siamak Noori, Kamran Shahanaghi ,ISI, (2013),pp 45–46
14-Lead time control in multi-class multi-stage assembly systems with finite capacity, Computers & Industrial Engineering, Saeed Yaghoubi , Siamak Noori , Amir Azaron,ISI,(2013),pp 808–817
15- Organizational grouping and performance in project-based organizations, aslib journal of information management, Bourouni, noori,Mostafa Jafari, ISI, 2013,pp 159-174
16- An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions، ISI، Risk Analysis، سید محمد سید حسینی , سیامک نوری, هاتفی،2009
17- An Integrated decision support system for project risk response planning ، ISI، Kuwait Journal of Science & Engineering، سید محمد سید حسینی , سیامک نوری , هاتفی، 2008
18- Optimisation of MRP by Fuzzy Multi- Objective Linear Programming ، ISI، Journal of Engineering Manufacture، سیامک نوری, فیلی زاده , باقرپور ,زرویستین , پارکین، 2008
19-A New Project Scheduling approach for improving multi-product multi- period (MPMP) Production planning problems ، ISI، Journal of Engineering Manufacture ، سیامک نوری, ماکویی , باقرپور ,زرویستین , پارکین، 2008
0- A gap Analysis on the Project risk management processes، ISI، Journal of Science & Eng. ، سید محمد سید حسینی, سیامک نوری , هاتفی، 2008
1-Calculating the Mean Project Completion Time in Dynamic PERT Networks (Multi-Project System) with Finite Capacity,International Journal of Industrial Engineering & Production Management (2013), S. Noori, S. Yaghoubi, November 2013, Volume 24, Number 3, pp 349-360.
2-A heuristic method for consumable resource allocation in multi-class dynamic PERT networks,Journal of Industrial Engineering International, Saeed Yaghoubi, Siamak Noori and Mohammad Mahdavi Mazdeh,2013,PP 1-12.
23-A novel modeling approach for job shop scheduling problem under uncertainty, Management Science Letters,Behnam Beheshti Pur, Siamak Noori and Reza Hosnavi Atashgah , (2013), PP 2725–2736
4-The presentation of network model for the development of innovation in R & D centers , Journal of Chinese Entrepreneurship , S.Noori, M.Jafari, M.Fathian, 2009.
5- Human Performance Factors in the Evaluation of Virtual Organizations ، International Journal of Business and Management، علمی- پژوهشی، سید محمد سید حسینی , سیامک نوری , بخشا، 2009
6- An FCM Approach to Better : Understanding of Conflicts A Case of New Technology Development، International Journal of Business and Management، علمی –پژوهشی، سیامک نوری , امیری , برونی، 2009
27-Applying Fuzzy Control Chart in Earned Value Analysis: A New Appliecation, World Applied Scinces Journal, S.noori, M.Bagherpour, A. Zareei, 2008.
8- Designing a Control Mechanism for Production Planning Problems by Means of Earned Value Analysis، Journal of Applied Sciences ، علمی- پژوهشی، سیامک نوری, باقرپور ,زرویستین، 2008
9- A mathematical model for the multi- mode resource investment problem، Journal of Industrial Engineering International ، علمی- پژوهشی، سبزه پرور , سید حسینی , سیامک نوری، 2008
0- Applying Fuzzy Control Chart in Earned Value Analysis: A New Application، World Applied Sciences Journal 3(4)، علمی- پژوهشی، سیامک نوری , باقرپور ، زارعی، 2008
31- Two polar concept of project risk management، New Frontiers in enterprise risk management، علمی- پژوهشی، سیدمحمد سیدحسینی، سیامک نوری، محمدعلی هاتفی، 2008
2- A generic project risk management process based on a two- polar perspective، Business Research year book، علمی- پژوهشی، سیدمحمد سیدحسینی، سیامک نوری، هاتفی، 2008
33-A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes ، Iust international Journal of Engineering Science ، علمی- پژوهشی ، سیامک نوری, سیدمحمد سیدحسینی، سبزه پرور ، 2007
4- An Analytical Integrated Methodology to estimate the expected impacts of project risks، International Academy of Business and Economics ، علمی- پژوهشی، سیدمحمد سیدحسینی، سیامک نوری، هاتفی، 2007
5-Applying Fuzzy logic to Estimate setup Times in Sequence Dependent single Machine scheduling problems ، IJCSMS، علمی- پژوهشی، باقرپور, نقندریان , سیامک نوری، 2007
6- Risk Response Actions Selection، IJAMT-Journal، علمی- پژوهشی، سیدمحمد سیدحسینی، سیامک نوری، محمدعلی هاتفی، 2007
7- Cost- time Trade off Models Application to Crashing Flow shop Scheduling Problems، LN Computer Science، علمی- پژوهشی، باقرپور , سیامک نوری , سیدجعفر سجادی، 2006
38- ارائه یک مدل یکپارچه KM جهت توسعه نوآوری در مراکز R&D ، سیامک نوری، محمد فتحیان، مسیح ابراهیمی، نشریه بین المللی مهندسی صنایع و مدیریت تولید، 1388
39- ارائه یک مسئله جدید با عنوان مساله مجاورت مصرف کنندگان و روشی ابتکارب برای حل آن ، نشریه بین المللی مهندسی صنایع و تولید، علمی- پژوهشی، سیدمحمد سیدحسینی , سیامک نوری , هاتفی , قدیریان، 1387
40- یک مدل یکپارچه استراتژیک برای دسترسی به تولید در کلاس جهانی، مجله بین المللی علوم مهندسی، سیامک نوری , مصطفی جعفری , علی عسگری، 1384
41- طراحی الگوی بهره وری مراکز پژوهشی کشور، مجله بین المللی علوم مهندسی، علمی- پژوهشی، سیامک نوری , مسعودی، 1383
42- نگرش ها تعاریف و ویژگیهای تولید در کلاس جهانی و ارائه مدل، مجله بین المللی علوم مهندسی، علمی- پژوهشی، سیامک نوری , علی عسگری، 1383
43- مطالعه ارزش رویکردی سریع و مطمئن در راستای ارتقا بهره وری، مدیریت فردا، علمی- ترویجی، سیامک نوری , ابراهیمی , زاهدی، 1386
44- مدیریت دانش ابزاری برای نوآوری محصول ، مدیریت فردا، علمی- ترویجی، سیامک نوری , علی عسگری، 1384
« آدرس لینک مقالات در گوگل اسکولار »
|